top of page
Blog: Blog2
Search
  • pompcpower

Struggles

3/8/19

This week we have made great strides with preparing for our experiment. However, we have also run into a few problems. We have reached out to several potential mentors that have experience in subsea engineering but we have only received two replies, one saying that they don't know much about the subject and the other allowing us to interview them but we haven't heard anything back from them since we sent our interview questions through email.

With our experiment, we have prepared a pre-lab that has listed our materials needed, addressed our variables, a written hypothesis, and a procedure. At this point, we are now getting ready to order the materials needed for our experiment and once that get's underway we'll be able to start experimenting.


1 view0 comments

Recent Posts

See All

A Crazy Week

4/29/19 We have been racing to get our online things into order as our May 20th deadline is sneaking up on us. We met up with our mentor on Friday April 12th and he gave us some very useful advice. He

bottom of page